production
STROKEPLANNING

This planning is very good to plan activities on ONE final product. The strokes are the different parts of this product and the length of the strokes are corresponding with the time that the parts are available. The periods can be showed in an amount of day's, for instance day1 till day12. In these total period there are 4 activities planned. 

The next planning is called a networkplanning, and is more fitted for different individual activities. The tags are connected with each other if they are related in time or physical.

BACK to page